YQ Bluenose Ted R

You might check the main mast step location. It looks to be sitting on frame 28, where it should be frame 29.
If you look at Dan's pictures you'll notice there is one frame between frame 31 with the holes for the bilge pumps and the location of the mast step.
 
Last edited:
You might check the main mast step location. It looks to be sitting on frame 28, where it should be frame 29.
If you look at Dan's pictures you'll notice there is one frame between frame 31 with the holes for the bilge pumps and the location of the mast step.
Thank you. I'll move it.
 
Hey Ted, looking straight down there should not be a gap that I highlighted in yellow. You need to move the mast step away from the rib with the two sump holes until the yellow lines are on top of each other. See FIG, 10 below. This is critical for the mast to line up with the deck opening.

REV.jpg
IMG_0083.jpg

This layout is critical as is all the other Fig's in the plans.
 
Parts 118-120 are etched on one side, see photo. The, Plans figure 11 don't show this etching. Im Assuming the etching goes up
Ted
IMG_20240524_150555.jpgIMG_20240524_150541.jpg
 
Back
Top